Precision in planning. Discipline in information.

Project-controls and data support for complex nuclear project environments, with attention to departmental interfaces, work readiness and traceable reporting.

The delivery challenge

Control the detail.
Understand the dependencies.

Departmental interfaces

Connect the plans and records that sit across operational and project teams, with clear ownership of information.

Work readiness

Make agreed prerequisites visible alongside the schedule, including work orders, permits and testing interfaces.

Intensive operating periods

Support a defined coordination and reporting rhythm during critical phases, with structured escalation and handover.

How Enncon helps

A practical view
of project delivery.

At Olkiluoto 3, extensive P6 scheduling was connected with departmental and ERP information. That emphasis on consistency and traceability informs the agreed controls scope; plant operational authority remains with the responsible organisation.

Our delivery approach

Agree the controls before mobilisation.

The proposal defines the planning and data scope, named responsibilities and review points. Document numbering, revisions, access and approvals follow the client’s applicable quality and document-control procedures. Required qualifications, reviewer competence and supplier checks are confirmed before mobilisation.

EnnconProject controls, demonstration
Work-front readinessIllustrative daily view
Work packagePrerequisite status
MEP installation / Area AReady
Electrical testing / Area BBehind, permit review
Mechanical works / Area CMaterial required
Commissioning / Area DReady
Owners assigned to open actionsExample only
Sample data, for layout only. Data date 31 Aug 2026. Source: sample file, revision 0.
Published experience

Explore the assignments.

Concrete construction work
Nuclear energy   /   Olkiluoto, Finland

Olkiluoto 3

Integrated planning and project information across departments, work orders, testing and permit-to-work processes.

Explore the project
Building structure under construction
Nuclear energy   /   Petten, Netherlands

PALLAS reactor

4D planning and data integration on the PALLAS research reactor, with the main contractor FCC Construcción.

Explore the project
Relevant expertise

Build the right combination.

02 / 4D planning

4D construction planning and scheduling

Schedules are developed against an agreed work breakdown structure and linked to the BIM model, so the proposed sequence can be simulated, coordinated across contractors and challenged while changing it is still practical.

Explore service
05 / Risk analysis

Schedule and cost risk analysis

Schedule and cost inputs are reviewed before modelling. Where the information supports an integrated assessment, dependencies and shared risk drivers are defined before the results are combined.

Explore service
Start a conversation

Discuss your planning, cost or reporting needs.

Tell us about the scope, the information you have and the decisions you need to make.

Discuss your project

Explore Enncon