Enncon plans, controls and reports on large and complex construction projects. The work is done by engineers who have planned, measured and coordinated projects on site, and, where services are combined, it is connected by one agreed reporting dataset that brings the schedule, the BIM model, cost and site records together.
Four services sit on that foundation: a review of where the project stands, the integration of its data, planning and cost control, and support during execution. Each can be ordered on its own. Together, they work from the same numbers.
The sections below follow that work from the site to the decisions it supports.
On a combined assignment, the site, the departments and the planning office report into one agreed dataset at agreed intervals; unresolved exceptions stay visible, and decisions stay with the client’s authorised team. Analytics turn it into controls, cost, reports and evidence, and a project web app gives each stakeholder the view their role needs.
Management, planning, quantities
Tracking and reporting
Centralised information
On a combined assignment the four services work from the same dataset; each can also run on the client’s existing records. Select a service to see where it sits.
Scroll sideways to see the full diagram.

The model is one more source in the project database, linked to the schedule and to cost. Its data is extracted into tables of components, properties, quantities and locations, and processed with the rest of the project records, with activities linked to model objects or work zones at the agreed level of detail, and model gaps and mapping coverage recorded.
In 4D, each activity is tied to the components it builds, so sequences can be checked against access, logistics and simultaneous operations before work starts. 4D supports sequence and interface reviews; it does not replace design checks, method statements or the authorised site team’s decisions. Where the model is suitable, extracted quantities support the cost forecast after reconciliation; non-modelled work and indirect costs are included separately.
Before
With Enncon
Reporting
Assembled by hand from exports, days or weeks behind the work.
Produced at agreed intervals from validated data, with the data date shown.
Progress
Reported as percentages per contractor.
Measured against activities and model components.
Cost
Reconciled at month end.
Re-forecast each period with progress and commitments.
Issues
Found in the monthly report.
Flagged when they show in the data, with an owner.
Decisions
Taken on different versions of the numbers.
Taken on one traceable set of figures.
Most projects start where the pressure is, and add the other services when they are needed.
Reported progress and reality no longer match.
Start with 01
Project review
Reports are assembled by hand and arrive late.
Start with 02
Data integration
A new baseline, a recovery plan or a forecast to defend.
Start with 03
Planning, cost and risk
Peak execution, many contractors and interfaces.
Start with 04
Execution support
Not sure which applies? A short conversation about the project is usually enough to decide.
Tell us what you are building and where you need support.