Integrated Primavera P6 schedules
Develop Level 1–4 schedules from project milestones through detailed work packages. Establish work breakdown structures, calendars, coding and logic that can be maintained by the delivery team.

Schedules are developed against an agreed work breakdown structure and linked to the BIM model, so the proposed sequence can be simulated, coordinated across contractors and challenged while changing it is still practical. Access, work areas and overlapping activities are reviewed with the delivery teams rather than assumed.
A credible schedule connects scope, access, resources and handovers. We work with project teams to build a schedule that reflects these relationships, then use structured updates to keep the plan relevant as conditions change.
Explore the order of work in an illustrative model. A project review also needs the agreed logic, access constraints and handover conditions.
Illustrative sequence and assumptions. Model stages do not represent measured progress or a validated construction method.
Illustrative sequence · synthetic model · sequence position is not measured progress.
Explore 4D planning →The service is tailored to the assignment. We agree the scope, required inputs and acceptance criteria before delivery.
Develop Level 1–4 schedules from project milestones through detailed work packages. Establish work breakdown structures, calendars, coding and logic that can be maintained by the delivery team.
Link agreed BIM objects and model areas to schedule activities. Review the sequence visually to identify access constraints, space conflicts and the order of work across disciplines.
Connect design releases, procurement, installation, testing and handover. Record prerequisites and make ownership of each interface clear before work enters the look-ahead.
Apply agreed progress rules, assess the critical and near-critical paths and prepare short-term plans. Separate reported progress from the evidence supporting it.
Review resource demand, work fronts and opportunities for resequencing. Compare recovery options against the baseline and document the assumptions behind each option.
Bring contractors and stakeholders into structured planning sessions. Issue clear milestone, variance and exception reports that explain what has changed and where action is needed.
IFC models linked to the schedule to review construction sequences, work areas and interfaces.

At PALLAS, construction models are linked to the schedule in a 4D environment. Activity coding, model objects and work areas are aligned so that proposed sequences and changes can be reviewed together.
Read the project accountNo. Schedule development and readiness planning can begin with the available scope and schedule information. 4D work requires a suitable model and an agreed method of linking objects to activities.
Yes. We can review and develop an existing schedule, establish a consistent update process and document changes to structure, logic and progress measurement.
A shared construction sequence gives the team a practical basis for coordinating work and responding to change.