Construction model and connected information illustration
Example outputs

Clear outputs.
Visible assumptions.

Explore illustrative examples of how project information can be structured. The layouts show the purpose of an output; every assignment defines its own sources, measures and reporting rules.

EnnconProject controls, demonstration
Delivery performanceExample reporting period 06
Planned progress98%Agreed baseline
Actual progress94%Measured quantity
Variance−4 ppThreshold −2 pp, sample
100%75%50%25%0%P1P2P3P4P5P6
— Actual   - - PlannedIllustrative data / not a client report
Sample data, for layout only. Data date 31 Aug 2026. Source: sample file, revision 0.

Performance reporting

Performance reporting

Connect the measure with the explanation.

A performance view should show what is being measured, the baseline for comparison and the reporting cut-off. The example uses synthetic progress values to illustrate a planned-versus-actual comparison.

  • Agreed definitions for planned and actual progress
  • A consistent reporting period and measurement basis
  • Visible variance and the explanation behind it
Explore the related service
Designed around the decision

An effective report answers a question—and makes the source, timing and assumptions behind the answer clear.

Schedule risk illustration

A distribution, with its assumptions visible.

Compare P50 and P80 in a synthetic set of completion weeks. An assignment includes model checks, the basis of the inputs, dependencies, sensitivity results and the limits of the analysis.

Explore risk analysis →
PSchedule risk scenariosSynthetic outcomes
Read the result with its basis.

The base example uses 361 synthetic outcomes. Confidence levels describe this dataset, not project certainty.

This is a comparison of illustrative datasets, not a Monte Carlo simulation or a client forecast. The mitigation example assumes a two-week shift in all outcomes.

Interactive cost example

A forecast you can interrogate.

Move an assumption and see the effect on the cost bridge and the estimate to complete.

€Cost forecast workbenchSynthetic EUR millions

From budget to forecast

EUR m

What makes up the forecast?

Actual cost + unpaid commitments + uncommitted remaining work

Illustrative figures, not a client forecast. Categories are mutually exclusive in this example; unpaid commitments exclude recorded actual costs.