Construction data integration

See which project figures are verified and which still need checking.

On complex projects, the information needed to coordinate the site and control cost is spread across many departments, systems and files. Each team describes the same scope in its own way. The BIM model uses components and locations, the schedule uses activities, procurement uses orders and deliveries, and the commercial records use contracts and cost accounts.

Enncon links records for the same scope of work in a database you control. Your planners can check reported progress against site measurements, and your cost managers can use those same quantities to forecast the remaining cost. Your teams keep their existing systems.

One view from design to handover

Teams use the same records from design and procurement through installation, testing and handover.

Problems found while there is time to act

Record owners can resolve discrepancies while there is still time to act.

Positions that rest on records

Teams can trace progress figures, costs and the evidence for commercial positions back to the source records.

What the service covers

Models, schedules, documents and registers are broken down into their components, linked where they describe the same work, and checked against their source.

Records broken down

Design models, drawings, schedules, procurement records, cost reports and site records broken down into their components, with the relevant details extracted.

Matching and links

Matching rules link records that describe the same work, even when they use different names or codes. Links are made by component, system, location, activity, work package or contract.

Checks against the source

Each link checked against its source; missing or conflicting information referred to the team responsible for that record.

A live project database

The linked records kept current in one database under the client’s control, with the WBS mapped to the CBS.

Engineers who use it

Enncon plans and schedules the work, tracks cost and supports site coordination from the same records, so the data is used every day.

Deliverables: the live project database and its checked links, analysis and dashboards for each team, and documents that explain how to maintain and hand over the integration.

Project database · workspace

Main works, week 32

Illustrative example

Select a component

Illustrative data, not from a client project. Equipment tags, record numbers and checks are examples.

Who works from it

Enncon engineers support each of these teams, preparing the analysis, forecasts and coordination that each decision requires.

Planners and cost managers

Site measurements compared with the schedule to show actual progress and forecast the cost of the remaining work.

Commissioning teams

Open inspections and work orders found before testing starts.

Commercial teams

Quantities in a payment application traced back to site measurements and approved changes.

Directors and senior managers

The whole project in one view, so new problems are seen while there is still time to act.

How the work runs

  1. 01

    Discovery

    Systems, record owners and reporting needs mapped, and the data model agreed. A non-disclosure agreement comes first.

  2. 02

    Break down and link

    Models, schedules, documents and registers broken down and linked by component, system, location, activity, work package or contract.

  3. 03

    Check and refer

    Each link checked against its source, with gaps and conflicts referred to the owner of the record.

  4. 04

    Run every day

    Enncon engineers keep the database up to date and use it to plan, track cost and support coordination. The handover is defined in the contract.

Questions about construction data integration

Do our systems need to change?

No. Primavera P6, the ERP, the BIM and document platforms and the site tools stay in place, and so does the way the project is organised. The integration reads from them and links their records.

Where is the project data held?

Under the client’s control: in the client’s environment, or on EU hosting agreed for the project. A non-disclosure agreement is signed before any data is shared, and ownership and handover of data and tools are set out in the contract.

Which tools are used?

SQL databases and Python for import, matching and checks, and a project-specific web application where reporting, data entry or review workflows are needed. The choices follow the client’s IT standards, and the proposal identifies any separate licence or hosting costs.

How does it work with the supporting services?

The supporting services can be ordered on their own. Combined with construction data integration, they work from the same records: the P6 schedule supplies the activities, the Situation Room uses the live status every day, and a project review tests reported figures against the same sources.

How soon is the database useful?

A discovery phase comes first, to map the systems and agree the data model. The first linked sources are in use as soon as they are checked, and the timing is agreed in the proposal.