Primavera P6 planning and 4D sequencing

One coordinated schedule, from the first baseline to handover.

The Primavera P6 schedule is developed from the first baseline and maintained through regular progress updates. Contractor schedules are combined into one coordinated schedule, and the dependencies between design, procurement, installation and testing are checked.

At each update, we check whether a delay affects handover or can be absorbed within the schedule. If recovery is needed, you can compare the effect of each option on dates, resources and cost before choosing a sequence. You can order this service on its own or as the planning basis for construction data integration.

One coordinated schedule

Contractor schedules combined, with the dependencies between design, procurement, installation and testing checked.

Sequences tested before work starts

Access, installation order and handovers between trades checked in 4D before work starts.

Forecasts with stated confidence levels

Milestones and budgets tested with QSRA and QCRA, and the main risks named.

What the service covers

Schedule, 4D model and cost share one structure and are updated each reporting period.

Baseline and updates

Enncon establishes the P6 baseline, then updates the current schedule and reviews the critical path at each update.

Coordinated contractor schedules

Contractor schedules combined into one schedule on one WBS, with the dependencies between them checked.

4D sequencing

Schedule activities linked to the BIM models to test access, installation order and handovers between trades before work starts.

Recovery schedules

If the project falls behind, Enncon prepares recovery schedules for contractual approval. Each option shows the impact on milestones, resources and cost.

Earned value

The WBS mapped to the CBS, so planned value, earned value and actual cost are compared for the same scope and reporting date.

Schedule and cost risk analysis

QSRA and QCRA estimate the likelihood of achieving a milestone or a budget and identify the main risks.

Deliverables: baseline and updated P6 schedules, 4D sequence checks, recovery schedules, earned value reports and, where required, QSRA and QCRA reports.

P6 planning and 4D · period report

Main works, week 32

Illustrative example
Baseline finishM13
Forecast finishM14
Variance4 wk late
Critical activities5 of 7
Schedule summary: baseline and forecast for seven activities, illustrative dataM1M3M5M7M9M11M13SubstructureSuperstructureEnvelopeMEP rough-inHook-up and testingCommissioningHandoverData date
Schedule summary, months from project start, illustrative data
ActivityBaselineForecastCriticalFloatComplete
Substructure0 to 40 to 4NoComplete100%
Superstructure2 to 72 to 8Yes0 wk90%
Envelope5 to 106 to 11No3 wk35%
MEP rough-in6 to 106.5 to 11.5Yes0 wk30%
Hook-up and testing9 to 1210.5 to 13Yes0 wk0%
Commissioning11 to 1312 to 14Yes0 wk0%
Handover13 to 1314 to 14Yes0 wk0%
Illustrative data, not from a client project. Reports are produced each period from the project’s own schedule and cost data.

What the schedule must capture, by sector

The tools are the same on every project. What the schedule and the cost structure have to capture depends on the sector.

Nuclear energy

Hold points and commissioning windows built into the schedule, with risk analysis for inspection and licensing uncertainty.

Semiconductors

Base build, hook-up and tool move-in on one schedule, with 4D checks of areas, routes and simultaneous operations.

Data centres

Repeatable hall-by-hall schedules, long-lead equipment tied to its activities, and cost forecasts per hall.

Civil and infrastructure

Schedule and cost structure aligned with the bill of quantities, so measured quantities drive progress and payments.

How the work runs

  1. 01

    Structure

    WBS, CBS and activity coding agreed with the project, so schedule and cost share one structure from the start.

  2. 02

    Baseline

    Schedule built or reviewed, contractor schedules integrated, the sequence checked in 4D and the baseline approved.

  3. 03

    Control cycle

    Progress measured, schedule and cost updated, and earned value and forecasts reported each period.

  4. 04

    Risk and recovery

    QSRA and QCRA where forecasts must be defended, and recovery sequences when the project falls behind.

Questions about P6 planning and 4D sequencing

Do you work in our Primavera P6 environment?

Yes. Schedules are built and maintained in the client’s P6 database, or delivered as P6 files to the client’s standards and coding. Contractor schedules prepared in other tools can be integrated into the project schedule.

What does 4D add to a schedule?

Relevant activities are linked to model objects or work zones at the agreed level of detail, and model gaps and mapping coverage are recorded. 4D supports sequence and interface reviews before work reaches site; it does not replace design checks, method statements or the authorised site team’s decisions. Where the model is suitable, extracted quantities support the forecast after reconciliation to the agreed measurement rules; non-modelled work and indirect costs are included separately.

When is a QSRA or QCRA worth doing?

When a date or a budget has to be defended, or when the team needs to know which risks drive the result. The analysis is only as reliable as the schedule logic and the risk register behind it, so both are checked before any simulation is run.

Can the service run as monthly support?

Yes. It can be ordered for a defined deliverable, such as a baseline, a recovery plan or a risk analysis, or as monthly support in which Enncon runs planning and cost control inside the project team.