Clarity for complex
project delivery.

We connect design, procurement, schedule, cost and site records so your team can see what is ready to start, where progress is slipping and what the remaining work is likely to cost.

Nuclear · Semiconductors · Data centres · Infrastructure

Engineers who connect your project data.

At Enncon, we combine large project experience with IT and data analytics capabilities to make sense of the vast amounts of information modern projects generate. By connecting schedules, work orders and progress records, we can identify risks and trends that are difficult to see in any single report. We use those insights to help clients decide where to focus resources and when to act.

What Enncon delivers

Construction data integration

One live database for the whole project, built from the client’s own records and used every day by Enncon engineers.

When progress reports disagree, we check what each team measured, which work it covered and when. We trace each figure to its source and ask the team responsible to resolve any difference. You can see whether the evidence supports the reported progress before you update the forecast or assess a payment application.

Your planners and cost managers use the verified records to update the schedule and forecast the cost to complete. Your commercial team can trace quantities in a payment application or claim back to site measurements and approved changes. The database stays under your control and works with your existing systems.

Supporting services

Primavera P6 planning and 4D sequencing

Coordinated P6 schedules, 4D sequence checks, recovery schedules, earned value reporting, and schedule and cost risk analysis.

Scope and deliverables

Situation Room

Daily tracking of progress, simultaneous operations and clashes, with coordination meetings and escalation to management.

Scope and deliverables

Project status and performance review

Reported progress, cost and forecasts checked against the baseline and site records, with recommended actions in order of priority.

Scope and deliverables

How the services fit together

When a handover slips, the performance review checks what is ready, the planner tests another sequence in P6 and 4D, and the Situation Room brings the options to client management.

Live information

Planning and project structure

Primavera P6 and 4D sequencingTest the sequence of trade handovers.Activities and locationsUnified project structureMap work packages (WBS)to cost accounts (CBS).Linked recordsLive project databaseTrace each record to its source.P6 exchanges progress and forecasts with the database.

Daily coordination

Enncon teamCoordinationClient managementDecisions and approvalsDecisionsUpdates and optionsSituation RoomCoordination meetings to identify deviationsand agree recovery options with the trades.Approved daily planConstruction site

Records, analysis and performance

Match and verify recordsSite, design and planning, cost and procurement,safety, quality and commissioning.Live project databaseFindingsPerformance reviewCheck reported progressand cost against records.Project analysisAssess the critical pathand forecast cost.Enncon deliverablesSituation Room

Select a box for details.

View the full project workflow

Complex project experience

Nuclear power plant, Finland, 2018–2020

Olkiluoto 3

Founder’s role: P6 planning and site coordination, with Areva.

A Primavera P6 commissioning schedule of around 7,000 activities, integrated with the project ERP and around 23,000 active work orders. It became the daily working tool of the plant status management department.

Semiconductor fab, Ireland, 2021–2025

Intel Fab 34

Founder’s role: Primavera P6 planning and project controls.

Information from more than 12 departments and over 15 software tools brought into one project database. It included a move-in schedule of around 15,000 activities and one payment application for all work.

Semiconductor R&D, Oregon, 2025

Intel R&D facility

Founder’s role: Schedule control for fab construction projects.

One schedule control system for around 27 parallel projects, tracking slippage and simultaneous operations. Its records later supported the client’s requests for extension of time.

About Enncon

Sectors

A reactor building dome being lifted into place by a heavy crane

Schedules that respect permits, hold points and work windows.

Equipment, documents, work orders and inspection records linked, so reported status traces to controlled records.

Explore nuclear energy

Frequently asked questions

Can the supporting services be ordered separately?

Yes. Each supporting service can be ordered separately, or alongside construction data integration.

Does the client need to change its systems?

No. Primavera P6, the ERP, the BIM and document platforms and the site tools stay in place, and so does the way the project is organised. The integration reads from them and links their records.

How does an engagement start?

Start with a short, non-confidential description of the project. A non-disclosure agreement is signed before any project data is shared. Enncon then issues a proposal stating the scope, deliverables and assumptions, and the work is led by a named Enncon lead, with a client counterpart for each service.

Where is project data hosted?

Project data remains under the client’s control. Integrations run in the client’s environment or on EU hosting agreed for the project, and ownership and handover of data and tools are set out in the contract.

Who makes decisions and approves the work?

Decisions, approvals and site safety remain with the client’s authorised personnel. Enncon provides the agreed integration, planning, coordination and analysis.